Loganholme WWTP – Inlet Works & Bypass Pipework

Client: Stirloch Constructions
Location: Loganholme Waste Water Treatment Plant, Loganholme, QLD
Status: Complete, August 2013

The Loganholme WWTP contract included the supply of plant & labour, equipment, supervision, and permits required to complete the job.

The works included:

  • Safety plans, method statements, ITPs and environmental reports
  • Survey set out
  • Construction of a new 1200mm diameter rising main connection from Alfred Street Pump Station
  • New diversion header
  • Construction of 1200mm diameter mild steel pipeline and connections to new inlet works
  • Duplication of the screened sewerage pipelines ranging in size from 900 to 1650 diameter including the bypass pipe work duplication
  • Construct pump station and pipework
  • Manholes ranging in size from 2.1 to 3.6m diameter.
  • Welding and testing
  • Cut-ins and live connections to completed works