The Woolloongabba Trunk Sewer Upgrade contract included the supply of, plant & labour, equipment, supervision and permits required to complete the job.

The works included:

  • Safety plans, method statements, ITPs and environmental reports
  • Survey set out
  • Construction of 24 trunk and branch sewer manholes varying in diameter from 1.2 metres to 5 metres with depths from 3 metres to 17 metres.
  • Installation of AK liner
  • Welding and testing
  • Construction in high density traffic areas and council easements in Brisbane CBD including night works.